The Glass Is... (t+6)
Oct. 6th, 2005 04:36 pm50%. Half full, or half empty? My glass looks half full of space, which can be filled with other things...
I have a job next week, or half a job at least. Until December, I have five days work each fortnight... It follows the geometric progression of dwindling contracts: 12 months, 6 months, 3 months, 3 months @ half-time. I'm not holding out for a 1.5 month contract after that - I think I've found the quantum unit of CSIRO contracts, and no smaller subdivisions are likely to crop up.
I assume that this is effective as of Monday, and that I'll get a physical contract to sign sometime soon. Newly available time next week will be spent doing layout on Insurgent #3, and then I'll start work on commission painting to clear through the excess of work on that front. My new contract ought to finish around Christmas, after which I want to head back to the Cradle Mountain/Lake St. Clair Overland Track. Beyond that, who knows what will happen next year?
To do:
Design:
- Copy editing for Insurgent #3
- Layout, upload to WAU
Painting:
- Cygnar: WM Prime figures for
bishi_wannabe
- Grey Knights for Ebay sale
- Predator, for Ebay sale
Study:
- Apply for courses in 2006
I have a job next week, or half a job at least. Until December, I have five days work each fortnight... It follows the geometric progression of dwindling contracts: 12 months, 6 months, 3 months, 3 months @ half-time. I'm not holding out for a 1.5 month contract after that - I think I've found the quantum unit of CSIRO contracts, and no smaller subdivisions are likely to crop up.
I assume that this is effective as of Monday, and that I'll get a physical contract to sign sometime soon. Newly available time next week will be spent doing layout on Insurgent #3, and then I'll start work on commission painting to clear through the excess of work on that front. My new contract ought to finish around Christmas, after which I want to head back to the Cradle Mountain/Lake St. Clair Overland Track. Beyond that, who knows what will happen next year?
To do:
Design:
Painting:
- Grey Knights for Ebay sale
- Predator, for Ebay sale
Study: